Loading...
HomeMy WebLinkAbout0119164-Plumbing (2 lavs) e OSHKOSH ON THE WATER Job Address 471 HIGH AVE CITY OF OSHKOSH No 119164 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Owner ST PETERS CONG Create Date 04/27/2006 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker - Local Waste Ice Chest FlriWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor D R GLAZE PLUMBiNG Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ofWork Valuation Issued By 2 LndryTray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Replace wall hung lav with dble bowl vanity lavs. "check #3991 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0102790000 $4,000.00 $0.00 Permit Fees $20.00 0 Permit Voided I Plan Approval Date 04/27/2006 In the performance of this work, I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Address Date 1865 JAMES RD AgenUOwner OSHKOSH 920-589-4014 WI 54904 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.