Loading...
HomeMy WebLinkAbout0119156-Plumbing (relay) ~ OSHKOSH ON THE WATER Job Address 1046 GREENWOOD CT CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD No 119156 Owner M J MOKLER PROPERTIES LLC Create Date 04/27/2006 Plan Contractor O'NEILL ENTERPRISE INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 430 -Industrial-Exterior (laterals) Water Softner Wait. 51. Shamp Sink Coffee Maker - Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Relay two water services under orders from the Water Department (Debit Account) Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service 11/2" Plastic Lateral 2 Relay Parcelld # 1522640000 Valuation $5,000.00 Plan Approval Issued By $0.00 Permit Fees $100.00 0 Permit Voided I Date 04/27/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date WI 54902 - 0000 Address 522 W 6TH AVE AgenUOwner OSHKOSH Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed withintwo business days from the time the project is ready.