Loading...
HomeMy WebLinkAbout0119166-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1113CEAPEAVE CITY OF OSHKOSH No 119166 Contractor DR GLAZE PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work PLUMBING PERMIT - APPLICATION AND RECORD OWner TODD D DOWLAND Create Date 04/27/2006 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump 1 Classrm Sink Breakrm Sink Ejector/Grind $650.00 Plan Approval Category 411 - Residential-Water Heaters Plan Water Softner Wait.St. Shamp Sink Coffee Maker ~ Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap ~ Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Replace gas water heater "check #3993 Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0805080000 Valuation Issued By $0.00 $20.00 D Permit Voided I Permit Fees Date 04/27/2006 In the performance of this work, I agree to perform all work pursuant to ruies governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongiy urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1865 JAMES RD Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.