Loading...
HomeMy WebLinkAbout0119168-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1325 BOWEN ST CITY OF OSHKOSH No 119168 PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEULISA DREES Create Date 04/27/2006 Contractor 0 R GLAZE PLUMBING Category 411-Residential-WaterHeaters Plan Bathtub Shower Water Softner Wait.St. Shamp Sink Coffee Maker - Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap - Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures UselNature ofWork Replace electric water heater "check #3992 "No EIV Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1507720000 Valuation $550.00 Plan Approval $0.00 Permit Fees $20.00 D Permit Voided I Issued By Date 04/27/2006 In the performance of this work, I agree to perform ail work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1865 JAMES RD AgenUOwner OSHKOSH WI 54904 - 0000 Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.