HomeMy WebLinkAbout0119168-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1325 BOWEN ST
CITY OF OSHKOSH
No
119168
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MICHAEULISA DREES
Create Date 04/27/2006
Contractor 0 R GLAZE PLUMBING
Category 411-Residential-WaterHeaters
Plan
Bathtub Shower Water Softner Wait.St. Shamp Sink Coffee Maker
-
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
-
Toilet Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
Res. Sink Dishwasher Beer Tap Hand Sink Urinal Eye Wash Statn
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Water Heater 1 Classrm Sink Sterilizer Surgeons Sink Ice Maker Deduct Meters
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
UselNature
ofWork
Replace electric water heater "check #3992 "No EIV
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1507720000
Valuation
$550.00
Plan Approval
$0.00
Permit Fees
$20.00 D Permit Voided I
Issued By
Date 04/27/2006
In the performance of this work, I agree to perform ail work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1865 JAMES RD
AgenUOwner
OSHKOSH
WI 54904 - 0000
Telephone Number
920-589-4014
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.