HomeMy WebLinkAbout0119122-Building (raze storage building)
~
OSHKOSH
ON THE WATER
Job Address 2532 HARRISON ST
CITY OF OSHKOSH
No
119122
BUILDING PERMIT - APPLICATION AND RECORD
Owner ANDERSON MINI STORAGE LLC
Create Date
04/26/2006
Desi9ner
Contractor
OWNER
Category
285 - Wrecking (Industrial & Commercial
Plan
Type
0 Building
0 Sign
0 Canopy
0 Fence
. Raze
Zoning
Class of Const:
Size 24x40
Unfinished/Basement -------2 Sq. Ft. Rooms
Finished/Living -------2 Sq. Ft. Bedrooms
Garage -------2 Sq. Ft. Baths
Height 0 Ft.
D Projection I
Stories 1
Canopies
Signs
Foundation
0 Poured Concrete. Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated' Wood
0 Other
Occupancy Permit Not Required
Flood Plain ~
# Dwelling Units --------.J>
Height Permit
Park Dedication
# Structures
Use/Nature Raze and Remove rear (east) 24x40 storage building.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contracto
$2.000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
Date 04/26/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1519500000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrlcüons of which it is not a party. if you perform the work
described in this permit application" asement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any essa vals before starting such activity. , /
Signature Date ~/':Z,/o ~
/ ,
Agent/Owner
Address 2222 WHITE SWAN DR
OSHKOSH
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.