Loading...
HomeMy WebLinkAbout0119140-Building (windows) 0 OSHKOSH ON THE WATER Job Address 940 W 6TH AVE CITY OF OSHKOSH No 119140 BUILDING PERMIT - APPLICATION AND RECORD Owner WILLIAM L RUPNICK Create Date 04/26/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----2 Sq. Ft. Rooms Finished/Living -----2 Sq. Ft. Bedrooms Garage -----2 Sq. Ft. Baths Height 0 Ft. 0 Projection I Stories Canopies 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFR /27 REPLACEMENT WiNDOW. SAME SIZE, SAME LOCATION AND REPLACE SIDING ON HOUSE WiTH VINYL of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,560.00 Plan Approval Issued By: "7) t.-J..fl $0.00 Permit Fee Paid $68.00 Park Dedication $0.00 Date 04/26/2006 Final/O.P. 00/00/0000 0 Pennit Voided I Parcelld # 0604340000 In the performance of this work I agree to perfonn all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easeme ity strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary ap als fore sta ing such activity. 6 Signature Date 4-;) 7~{) Agent/Owner OSHKOSH WI 54902 - 5851 Telephone Number Yd6 ~ )3 34t Address 940 W 6TH AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.