Loading...
HomeMy WebLinkAbout0119099-Buildng (landing w/steps) e OSHKOSH ON THE WATER Job Address 1027 WEISBROD ST CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD No 119099 Owner GLADYS A KING Create Date Designer Contractor DUNRITE CONSTRUCTION 04/25/2006 Category 141 - Exterior Remodeling . Building Plan Type 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ------.2 Sq. Ft. Bedrooms 0 Stories Garage ------.2 Sq. Ft. Baths 0 0 Projection I Canopies ------.2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Signs ------.2 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain - # Dwelling Units ~ Height Permit Park Dedication # Structures ~ Use/Nature SFR/ Installing a 4'x4' precast landing with steps off the front of the house. instailing code compliant handrails and guardrails. ofWork HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuation Issued By: U1C: $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date~ Final/O.p.~ 0 Permit Voided I Pareelld # 1305580000 In the performance of this work I agree to perform ail work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to.~e_eure. ã"ny ne/ s§" .~ I efore starting such activity. ( / /) Signature ¿/ l/¿,:¿:¿.."¡;. ," oS . Date "7"" "þlS"->t;./ 6"" Agent/Owner Oshkosh Wi 54901 - 0000 Telephone Number Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.