HomeMy WebLinkAbout0119099-Buildng (landing w/steps)
e
OSHKOSH
ON THE WATER
Job Address 1027 WEISBROD ST
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
No
119099
Owner GLADYS A KING
Create Date
Designer
Contractor
DUNRITE CONSTRUCTION
04/25/2006
Category
141 - Exterior Remodeling
. Building
Plan
Type
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ------.2 Sq. Ft. Bedrooms 0 Stories
Garage ------.2 Sq. Ft. Baths 0
0 Projection I
Canopies ------.2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Signs
------.2
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain -
# Dwelling Units ~
Height Permit
Park Dedication
# Structures
~
Use/Nature SFR/ Installing a 4'x4' precast landing with steps off the front of the house. instailing code compliant handrails and guardrails.
ofWork
HVAC Contractor
Electric Contractor
Plumbing Contractor
Fees: Valuation
Issued By: U1C:
$1,500.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date~
Final/O.p.~
0 Permit Voided I
Pareelld # 1305580000
In the performance of this work I agree to perform ail work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to.~e_eure. ã"ny ne/ s§" .~ I efore starting such activity. ( / /)
Signature ¿/ l/¿,:¿:¿.."¡;. ," oS . Date "7"" "þlS"->t;./ 6""
Agent/Owner
Oshkosh
Wi 54901 - 0000
Telephone Number
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.