Loading...
HomeMy WebLinkAbout0119098-Building VOID VOID VOID ~ OSHKOSH ON THE WATER Job Address 1026 WEISBROD ST CITY OF OSHKOSH No 119098 BUILDING PERMIT - APPLICATION AND RECORD VOID Owner ELIZABETH L BARTHELS LIFE ESTATE Create Date 04/25/2006 Designer Contractor DUN RITE CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement -----2 Sq. FI. Rooms Finished/Living -----2 Sq. Ft. Bedrooms Garage -----2 Sq. Ft. Baths Height 0 FI. 0 Projection I Stories Canopies Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFR/ Installing a 4'x4' precast landing with steps for the front exil. Code compliant handrails/guardraiis wlil be Installed. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 04/25/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1305500000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number, Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ~ OSHKOSH ON THE WATER Job Address 1026 WEISBROD ST CITY OF OSHKOSH No 119098 BUILDING PERMIT - APPLICATION AND RECORD Owner ELIZABETH L BARTHELS LIFE ESTATE Create Date 04/25/2006 Designer Contractor DUN RITE CONSTRUCTION Category 141, Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zonin9 Class of Const: Size Unfinished/Basement -----2 Sq. FI. Rooms 0 Height 0 FI. Finished/Living -----2 Sq. FI. Bedrooms 0 Stories Garage -----2 Sq. FI. Baths 0 0 Projection I Canopies Signs 0 Foundation . Poured Concrete 0 Fioatlng Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain - # Dwelling Units ~ Height Permit Park Dedication # Structures ~ Use/Nature of Work FR/ Installing a 4'x4' precast landing with steps for the front exil. Code compliant handrails/guardrails will be installed. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: Ù k. $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 04/25/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1305500000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an¥-d to s/~anzjt'Y ne7;~op;tTZre starting such activity. ~ -;;:)-5 Signature / øiæ. / /.~. " Date ;.- ':::OC / Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may continue if the inspection is not performed within two business days from the time the project is ready.