HomeMy WebLinkAbout0119108-Building (garage repairs)
e
OSHKOSH
ON THE WATER
Job Address 2119 N MAIN ST
CITY OF OSHKOSH
No
119108
BUILDING PERMIT. APPLICATION AND RECORD
Owner MARK A FERGUSON
Create Date
04/25/2006
Designer
Contractor
141 - Exterior Remodeling
LAIB RESTORATION INC
Category
Plan
Type
. Buildin9
0 Sign
0 Canopy Q Fence 0 Raze
Class of Const:
Rooms 0 Height ---.J! Ft.
Bedrooms Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Zoning
Size
Unfinished/Basement
---.J! Sq. Ft.
---.J! Sq. Ft.
0 Projection I
Finished/Living
Canopies
Garage
---.J! Sq. Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
---'>
Use/Nature
ofWork
FRI Pouring a new concrete slab under the existin9 garage, replacing headers and filling In any wood areas that have deteriorated. The
wner will be responsible for painting the exterior as part of compliance with the correction notice.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1000000 Plan Approval
~..
$0.00 Permit Fee Paid
Issued By:
$74.00 Park Dedication
$0.00
Date 04/25/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1516580100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application wi in an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure y n s ap rovals before starting such activity.
Signature Date x:- « 'l.f'-õ (.
Agent/Owner
Address 21WNEWYORKAVE
OSHKOSH
WI 54901 - 3757
Telephone Number
233-7026
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.