Loading...
HomeMy WebLinkAbout0119108-Building (garage repairs) e OSHKOSH ON THE WATER Job Address 2119 N MAIN ST CITY OF OSHKOSH No 119108 BUILDING PERMIT. APPLICATION AND RECORD Owner MARK A FERGUSON Create Date 04/25/2006 Designer Contractor 141 - Exterior Remodeling LAIB RESTORATION INC Category Plan Type . Buildin9 0 Sign 0 Canopy Q Fence 0 Raze Class of Const: Rooms 0 Height ---.J! Ft. Bedrooms Stories Baths 0 0 Pier 0 Other 0 Treated Wood Zoning Size Unfinished/Basement ---.J! Sq. Ft. ---.J! Sq. Ft. 0 Projection I Finished/Living Canopies Garage ---.J! Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ---'> Use/Nature ofWork FRI Pouring a new concrete slab under the existin9 garage, replacing headers and filling In any wood areas that have deteriorated. The wner will be responsible for painting the exterior as part of compliance with the correction notice. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1000000 Plan Approval ~.. $0.00 Permit Fee Paid Issued By: $74.00 Park Dedication $0.00 Date 04/25/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1516580100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application wi in an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure y n s ap rovals before starting such activity. Signature Date x:- « 'l.f'-õ (. Agent/Owner Address 21WNEWYORKAVE OSHKOSH WI 54901 - 3757 Telephone Number 233-7026 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.