Loading...
HomeMy WebLinkAbout0119107-Building (bathroom remodel) e OSHKOSH ON THE WATER Job Address 2005 FAIRVIEW ST CITY OF OSHKOSH No 119107 BUILDING PERMIT - APPLICATION AND RECORD Owner NYAL M SCHEUERMANN Create Date 04/25/2006 Designer Contractor CENTRAL STREET CARPENTRY Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement --------2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living --------2 Sq. Ft. Bedrooms --------2 Stories Garage --------2 Sq. Ft. Baths 0 D Projection I Canopies 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRI Remodeling the bathroom permit issued for the vanity portion. Tile, papering and trim does not require a permit. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1.boO.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication Issued By: $0.00 Date 04/25/2006 Final/O.P. DO/DO/DODO D Permit Voided I Parcelld # 1521400000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu necessary ap r efore sta Ing such activity, Signature 'f.,: , Date..K- f~2';---o(ê, Address 1435 CENTRAL ST OSHKOSH WI 54901 - 0000 Telephone Number 426-5147 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.