HomeMy WebLinkAbout0119107-Building (bathroom remodel)
e
OSHKOSH
ON THE WATER
Job Address 2005 FAIRVIEW ST
CITY OF OSHKOSH
No
119107
BUILDING PERMIT - APPLICATION AND RECORD
Owner NYAL M SCHEUERMANN
Create Date
04/25/2006
Designer
Contractor
CENTRAL STREET CARPENTRY
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement --------2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living --------2 Sq. Ft. Bedrooms --------2 Stories
Garage --------2 Sq. Ft. Baths 0
D Projection I
Canopies 0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFRI Remodeling the bathroom permit issued for the vanity portion. Tile, papering and trim does not require a permit.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1.boO.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
Issued By:
$0.00
Date 04/25/2006
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld # 1521400000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu necessary ap r efore sta Ing such activity,
Signature 'f.,: ,
Date..K- f~2';---o(ê,
Address 1435 CENTRAL ST
OSHKOSH
WI 54901 - 0000
Telephone Number
426-5147
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.