HomeMy WebLinkAbout0119109-Electric (service change)
e
OSHKOSH
ON THE WATER
Job Address 903 ARMORY PL
CITY OF OSHKOSH
ELECTRIC PERMIT. APPLICATION AND RECORD
No
119109
Owner
JOHN RIJANET M ROSS
Create Date 04/25/2006
Contractor
HOMEOWNER
Category 634 - Residential-Service Change
Plan
Service ,0 New
Volts 120/240
Amps ~
. Change
0 Temp
ON/A Type 0 Overhead
Circuits ----2
Switches ----2
. Underground
Fixtures
----2
Receptacles ----2
Appliances
Use/Nature of SFR\ Service change from 100amp overhead to 200 amp underground. 100 panel to remain
Work
Fees: Valuation
$500.00
Plan Approval
$0.00
Permit Fee Paid
$20.00
Issued By:
Date 4/25/2006
[l Permit Voided I
Parcelld # 1308800000
The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied
as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other,
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform aii work pursuant to ruies goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approva fore starting uch activity.
Date L{ -d S--()V;
OSHKOSH
~ 5490 - 0000
Telephone Number
Signature
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.