HomeMy WebLinkAbout0119066-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 923 DOVE ST
CITY OF OSHKOSH
No
119066
BUILDING PERMIT .. APPLICATION AND RECORD
OWner KELLY J BURNETT
Create Date
04/24/2006
Designer
Contractor
OWNER
C~tegory
Type
141 - Exterior Remodeling
Plan
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
------2 Sq. Ft.
------2 Sq. Ft.
Rooms
Height ------2 Ft.
0 Projection 1
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
------2 Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Use/Nature ~FR - Re-side with vinyl over existing wood siding. Install new soffit and fascia. No electrical work to be done.
ofWork
II Dwelling Units 0
II Structures
0
Park Dedication
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuatio71 (7 $1.600.00 Plan Approval
Issued By: -J:- ) -
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 04/24/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld II 1603050000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to ure any ne"ary approvals before starting such activity.
Signature ð~~ Date '-/-..2H-oc.
AgenVOwner
q").v --r;/-{J--() <:) (
Address
"7,.¡. '" --.:ï::::o Jc- ..iT
Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.