Loading...
HomeMy WebLinkAbout0119061 B e OSHKOSH ON THE WATER Job Address 704 W 17TH AVE CITY OF OSHKOSH No 119061 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT G/HELEN ALCORN Create Date Designer 04/24/2006 Contractor HICKEY ROOFING Category 141 - Exterior Remodeiing Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms ---.J:! Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ---.J:! Sq. Ft. ---.J:! Sq. Ft. 0 Projection I Finished/Livin9 Canopies Garage ---.J:! Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units -------.JJ # Structures -------.JJ Use/Nature SFR/ Tear-off roofing, and instail new roofing on house and garage - No structural work of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,590.00 Plan Approval -~ Pennit Fee Paid $50.00 Park Dedication $0.00 Issued By: Date 04/24/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1301990100 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.