Loading...
HomeMy WebLinkAbout0119037-Plumbing e OSHKOSH ON THE WATER Job Address 1817 SIMPSON ST CITY OF OSHKOSH No 119037 PLUMBING PERMIT - APPLICATION AND RECORD OWner KATHERINE J ROESKE Contractor WATTERS PLUMBING Cate90ry 410 - Residential-Interior Create Date 04/20/2006 Plan Bathtub 0 Shower 1 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Int Grease Trap 0 Lavatory 1 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ofWork 1m",," ""00", ~'" ~, Size Material Type # 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service 0 0 0 0 0 Parcelld # 1407440000 Valuation $2.500.00 Plan Approval $0.00 Permit Fees $21.00 0 Permit Voided I Issued By Date 04/20/2006 In the performance of this work. I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy. if you perfonm the work described in this penmit application within an easement. the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 118 AgenUOwner MENASHA WI 54952 - 0118 Telephone Number 920-733-8125 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number. Type of Inspection (i.e. Footing, Service. Final. etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise. we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perlormed within two business days from the time the project is ready.