HomeMy WebLinkAbout0119023-Building (siding)
G
OSHKOSH
ON THE WATER
Job Address 1838 MCCURDY ST
CITY OF OSHKOSH
No
119023
BUILDING PERMIT. APPLICATION AND RECORD
Owner THOMAS P/MARY M HENDRICKS
Create Date
04/20/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms
Finished/Living ~Sq.Ft. Bedrooms
Garage ~Sq.Ft. Baths
Height 0 Ft.
D Projection I
Stories
Canopies 0
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFR/ Replacing steel siding with vinyl siding. soffit and fascia and a bilco door to the basement. James JOhnson (master electrician) will
of Work be performing any electrical alterations.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4.000.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
~
Date 04/20/2006
FinaI/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1408280000
In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is nota party. If you perform the work
described in this penmit application within an easem City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary a before rting such activity.
Signature /
Date
x~c:/b{,
Address PO BOX 2162
AgenUOwner
OSHKOSH
WI 54903 - 2162
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.