Loading...
HomeMy WebLinkAbout0119034-Building 0 OSHKOSH ON THE WATER Job Address 922 W 12TH AVE CITY OF OSHKOSH No 119034 BUILDING PERMIT - APPLICATION AND RECORD Owner KELLI C NUGENT Create Date 04/20/2006 Designer Contractor OWNER Category 150 - New Accessory Buildings-Garages (Residential) Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms ~ Stories Baths ~ Size 24)(24 Zoning Unfinished/Basement ~Sq.Ft. ~ Sq. Ft. 0 Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Not Required Flood Plain ~ # Dwelling Units -------.2 Height Permit Not Required Park Dedication # Structures -------.2 Use/Nature SFRI Construct 24' x 24' detached garage in rear yard as per site plan, and pave driveway within 18 months as per site plan - min 6 of Work inches off property line. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $62.00 Park Dedication $0.00 Issued By: ,¡Jrv- Date 04/20/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1305900000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to :;r}ure any nee ssary rovals before tarting such activity. 047 Signature" ¿.~ Date f/',;;?¿/ i/ (0 Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number --~ Address 9 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.