HomeMy WebLinkAbout0119034-Building
0
OSHKOSH
ON THE WATER
Job Address 922 W 12TH AVE
CITY OF OSHKOSH
No
119034
BUILDING PERMIT - APPLICATION AND RECORD
Owner KELLI C NUGENT
Create Date
04/20/2006
Designer
Contractor
OWNER
Category
150 - New Accessory Buildings-Garages (Residential)
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms ~ Stories
Baths ~
Size 24)(24
Zoning
Unfinished/Basement
~Sq.Ft.
~ Sq. Ft.
0 Projection I
Finished/Living
Canopies 0
Garage
~Sq.Ft.
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Not Required
Flood Plain ~
# Dwelling Units -------.2
Height Permit Not Required
Park Dedication
# Structures
-------.2
Use/Nature SFRI Construct 24' x 24' detached garage in rear yard as per site plan, and pave driveway within 18 months as per site plan - min 6
of Work inches off property line.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$8,000.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Issued By:
,¡Jrv-
Date 04/20/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1305900000
In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to :;r}ure any nee ssary rovals before tarting such activity. 047
Signature" ¿.~ Date f/',;;?¿/ i/ (0
Agent/Owner
OSHKOSH
WI 54902 - 0000 Telephone Number
--~
Address 9
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.