HomeMy WebLinkAbout0119017 B
e
OSHKOSH
ON THE WATER
Job Address 1521 WELLINGTON DR
CITY OF OSHKOSH
No
119017
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARK C/SIEGRIED NIELSEN
Create Date
04/19/2006
Designer
Contractor
OWNER
Category
256 - Parking Lots, Driveways
Plan
Type
. Buildln9
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~ Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
--~
Park Dedication
--
# Dwelling Units ----2
# Structures
----2
Use/Nature
of Work
FRI LATE PERMITI Installing a 29' x 35' concrete driveway that will be tapered to 24' wide at the front property line.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $2 600 00 Plan Approval
Issued By: ~,.
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Date 04/19/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1342710000
In the perfonnance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see any ecessary prova before starting such activity.
Signature
Date -<'1-/'7 - 0 (y
Agent/Owner
OSHKOSH
~ 54904 - 6358 Telephone Number
426-1544
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.