Loading...
HomeMy WebLinkAbout0118988-Building (windows) 0 OSHKOSH ON THE WATER Job Address 1023 WEISBROD ST CITY OF OSHKOSH No 118988 BUILDING PERMIT -APPLICATION AND RECORD Owner LISA M S NAHMENSIJENNA L PARK Create Date 0411812006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain - # Dwelling Units ---------.JJ Height Permit Park Dedication # Structures ---------.JJ UselNature ¡>FRI REPLACING 6 WINDOWS, SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,700.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication Issued By: A¿O $0.00 Date 0411812006 FinaIIO.P. 0010010000 0 Permit Voided I Parcelld # 1305590000 in the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an secure any n. eCÃappro~ls before starting such activity. ~ I } Signature '----i( /Ì/l/Vvi 1 ~ re-D Date ~ 1<6í cJ r.o I ~~ ' Address 1023WEiSBRODST OSHKOSH WI 54902 - 6261 Telephone Number 83-':7. d3S~ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.