Loading...
HomeMy WebLinkAbout0118980-Building (garage) e OSHKOSH ON THE WATER Job Address 2357 VINLAND ST CITY OF OSHKOSH No 118980 BUILDING PERMIT - APPLICATION AND RECORD Owner DONALD E HAGlE Create Date 04/18/2006 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. FinishediLiving ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 Proje~ Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ----------'1 # Structures ----------'1 Use/Nature SFRI install aluminum on garage soffit and fascia. and install 4 new vinyl replacement windows. of Work , HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5.388.00 Plan Approval $0.00 Permit Fee Paid ------ $50.00 Park Dedication $0.00 Issued By: Date 04/18/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1219610000 In the perfonnance of this work I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 706 S MAIN STREET Agent/Owner OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.