HomeMy WebLinkAbout0118980-Building (garage)
e
OSHKOSH
ON THE WATER
Job Address 2357 VINLAND ST
CITY OF OSHKOSH
No
118980
BUILDING PERMIT - APPLICATION AND RECORD
Owner DONALD E HAGlE
Create Date
04/18/2006
Designer
Contractor
LUECKS HOME IMPROVEMENT INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
FinishediLiving ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
0 Proje~
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ----------'1
# Structures
----------'1
Use/Nature SFRI install aluminum on garage soffit and fascia. and install 4 new vinyl replacement windows.
of Work
,
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$5.388.00 Plan Approval
$0.00 Permit Fee Paid ------ $50.00 Park Dedication
$0.00
Issued By:
Date 04/18/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1219610000
In the perfonnance of this work I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 706 S MAIN STREET
Agent/Owner
OSHKOSH
WI 54902 - 6084
Telephone Number
235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.