HomeMy WebLinkAbout0118974-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 547 OAK ST
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
No
118974
Contractor JOHN E MEYER CO
Bathtub 1
Whirlpool 0
Lavatory 2
Toilet 2
Res. Sink 1
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
OWner ROBERT J SCHRAA REV TRUST
Create Date 03/23/2006
Category 410 - Residential-Interior
1
0
0
0
1
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
0
0
1
0
0
0
0
0
0
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Plan
0 Shamp Sink -----.JJ
0 FlrlWst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash Statn 0
WtrSewerMtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Sterilizer
Dip Well
Drink Ftn
SFRI Remodeling the 2nd fioor bathroom. updating the kitchen. repairing the stairway, and installing a replacement window. Check #24330
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1102940000
Valuation
$6,000.00
Plan Approval
Issued By
$0.00
Permit Fees
$63.00 0 Permit Voided I
Date 04/18/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
235-2300
Address PO BOX 2783
Agent/Owner
OSHKOSH
WI 54903 - 2783
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.