Loading...
HomeMy WebLinkAbout0118978-Building (roof) e OSHKOSH ON THE WATER Job Address 525 EVANS ST CITY OF OSHKOSH No 118978 BUILDING PERMIT - APPLICATION AND RECORD OWner JEFFERY J/LiNDA STEINERT Create Date 04/18/2006 Designer Contractor IMPRESSIVE ROOFING AND SIDING INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -------2 Sq. Ft. -------2 Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies Garage -------2 Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units -~ # Structures -----.0 Use/Nature ~FRI Tear-off existing roofing, install new shingles, gutters and downspouts on house only. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,566.22 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication - $0.00 Issued By: Date 04/18/2006 Final/O.P. 00/00/0000 0 PenmitVoided I Parcelld # 1102760000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 2786 Agent/Owner APPLETON WI 54912 - 2786 Telephone Number 232-1669 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.