Loading...
HomeMy WebLinkAbout0118971-Building (exterior remodel) e OSHKOSH ON THE WATER Job Address 1600 S KOELLER ST CITY OF OSHKOSH No 118971 BUILDING PERMIT - APPLICATION AND RECORD Owner GREENE REAL ESTATE OF WI PTNSHP Create Date 04/17/2006 Designer Contractor OWNER Category 232 - Alteration Stores & Customer Service Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----2 Sq. Ft. -----2 Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage -----2 Sq. Ft. Baths 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature Retail/Install a cornice trim detail to top of exterior walls, eliminate half circle parapet extention on south elevation, eliminate backlit stripe of Work etail on the facade. HVAC Contractor Plumbing Contractor Fees: Valuation $6 000.00 Plan Approval $0.00 Permit Fee Paid $244.00 Park Dedication $0.00 Issued By: Date 04/17/2006 Final/O.P. DO/DO/DODO 0 Penmit Voided I Parcelld # 1307440404 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~(~ ~ ~wner Address 900 CHALLENGER DR GREEN BAY Date '1-17-01:. WI 54311 - 8399 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.