HomeMy WebLinkAbout0118971-Building (exterior remodel)
e
OSHKOSH
ON THE WATER
Job Address 1600 S KOELLER ST
CITY OF OSHKOSH
No
118971
BUILDING PERMIT - APPLICATION AND RECORD
Owner GREENE REAL ESTATE OF WI PTNSHP
Create Date
04/17/2006
Designer
Contractor
OWNER
Category
232 - Alteration Stores & Customer Service
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-----2 Sq. Ft.
-----2 Sq. Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
-----2 Sq. Ft.
Baths
0
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature Retail/Install a cornice trim detail to top of exterior walls, eliminate half circle parapet extention on south elevation, eliminate backlit stripe
of Work etail on the facade.
HVAC Contractor
Plumbing Contractor
Fees: Valuation
$6 000.00 Plan Approval
$0.00 Permit Fee Paid
$244.00 Park Dedication
$0.00
Issued By:
Date 04/17/2006
Final/O.P. DO/DO/DODO
0 Penmit Voided I
Parcelld # 1307440404
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature ~(~ ~ ~wner
Address 900 CHALLENGER DR GREEN BAY
Date '1-17-01:.
WI 54311 - 8399
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.