Loading...
HomeMy WebLinkAbout0118956-Building (roof) e OSHKOSH ON THE WATER Job Address 1652 BEECH ST CITY OF OSHKOSH No 118956 BUILDING PERMIT - APPLICATION AND RECORD Owner GREGG A UNDERHEIM Create Date 04/13/2006 Designer Contractor WERNER HOME IMPROVEMENTS LLC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size -~ Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Garage ~Sq.Ft. Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRI Removing and replacing the shingles on the house. No structural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2.200.00 Plan Approval $0.00 Permit Fee Paid - $32.00 Park Dedication $0.00 Issued By: cr(J Date 04/13/2006 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 1207450000 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to see yne ssaryapprov Is before starting such activity. Date v'" !a_(J! Signature "C!? 1.0 Agent/Owner OSHKOSH WI 54902 - 7513 Telephone Number 236-9109 Address 2147 POINT COMFORT RD To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.