Loading...
HomeMy WebLinkAbout2006-Building (siding) II e OSHKOSH ON THE WATER Job Address 1119REICHOWST CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD No 118939 Owner WilLIAM C GOHLKE Create Date 04/12/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~ Sq. Ft. ~ Sq. Ft. Rooms Height a Ft. 0 Projection I Finished/living Bedrooms Stories Canopies a Signs Garage ~Sq.Ft. Baths a Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures a Use/Nature SFR / REMOVE SIDING FROM HOUSE & GARAGE, REPLACE WITH VINYL, NO STRUCTURAL CHANGES, ElEC BY OWNER of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,800.00 Plan Approval $0.00 Permit Fee Paid ð)N $26.00 Park Dedication $0.00 Issued By: Date 04/12/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1309570000 in the performance of this work I agree to perform all work pursuant to nuies goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to. secur~ ~nV'ece.:sary appr als bef re st 'ng such activity. Signature c/./~~ Date 1""'-/;2 - ð b Agent/Owner WAUTOMA WI 54982 - 5881 TelephoneNumber f"z,p -~G-!> -/5 Address N1974 STATE ROAD 73 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.