HomeMy WebLinkAbout2006-Building (1st flr offices)
e
OSHKOSH
ON THE WATER
Job Address 448 N MAIN ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118936
Owner JAHNKE 448 MAIN LLC
Create Date
04/12/2006
Designer
Contractor
OWNER
Category
223 - Alteration Offices, Banks, Professional
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
UnfinishediBasement ~Sq.Ft. Rooms ~ Height a Ft.
FinishediLiving ~Sq.Ft. Bedrooms a Stories
Garage ~Sq.Ft. Baths a
0 Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floatin9 Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Required
Flood Plain -
# Dwelling Units a
Height Permit
Park Dedication
# Structures
~
Use/Nature First Floor /Install partition wall to separate front tenant from rear tenant, Install demountable partition walls in rear tenant space to create
of Work ß offices.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$0.00 Penmit Fee Paid
$99.00 Park Dedication
$0.00
Issued By:
Date 04/12/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0400960000
In the performance of this work I agree to perform all work pursuant to nuies goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restriclions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
halder(S~ure n necess a provals efa e starting such activity.
Signature :::::.s. ~
Agent/Owner
OSHKOSH
Date 1Jj ;:;~(C
Address 3464 MILFORD DR
WI 54904 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.