Loading...
HomeMy WebLinkAbout0118944-Building (siding) ~ OSHKOSH ON THE WATER Job Address 1421 W BENT AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118944 Owner FREDERIC J KUBSCH Create Date 04/12/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms ~ Stories Garage ~Sq.Ft. Baths ~ 0 Projection I Canopies ~ Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Structures Park Dedication # Dwelling Units ~ ~ Use/Nature ~FR / INSTAll SIDiNG ON HOUSE, REPLACING EXISTING SIDING WITH VINYL, NO STRUCTURAL CHANGES, ELECTRiCAL NOT of Work ¡o.PPLICABlE HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: /?/l.ð Date 04/12/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1200980000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to se urn any necessary appro Is before tarti such ac' ity. e... Signature Date L(-/J--O b Address 1421 W BENT AVE OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.