Loading...
HomeMy WebLinkAbout0118915-Building (roof) e OSHKOSH ON THE WATER Job Address 1938 ALASKA ST CITY OF OSHKOSH No 118915 BUILDING PERMIT - APPLICATION AND RECORD Owner LEONARD RICHTER Create Date 04/1212006 Designer Contractor THD AT-HOME SERVICES INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms ~ Height OFt. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. 0 Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures ~ Use/Nature SFRI Tear-off rrofing, install new felt, fiashing, vents, shingles, gutters. and downspouts. - NO Structural World of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $11,835.00 Plan Approval $0.00 Permit Fee Paid $84.00 Park Dedication $0.00 Issued By: Date 04/1212006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1407200000 In the performance of this work I agree to perform all work pursuant to nules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 3200 COBB GALLERIA PKWY STE 200 ATLANTA GA 30339 - 0000 Telephone Number 630-832-4049 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.