Loading...
HomeMy WebLinkAbout0118929-Building (roof) e OSHKOSH ON THE WATER Job Address 649 W 9TH AVE CITY OF OSHKOSH No 118929 BUILDING PERMIT. APPLICATION AND RECORD Owner CHASE MANHATTAN MORTGAGE CORP Create Date 04/12/2006 Desi9ner Contractor AMERICAN HANDYMAN SERVICES Cate90ry 141 - Exterior Remodeiing Plan Type . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size UnfinishedfBasement ~Sq.Ft. Rooms Finished/Living ~Sq.Ft. Bedrooms Garage ~Sq.Ft. Baths Hei9ht 0 Ft. D Projection I Canopies ~ Stories Signs ~ Foundation . Poured Concrete 0 Fioating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFR / TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE ADDITION. REPLACE WOOD DECKING. NO STRUCTURAL of Work CHANGES. NEW FASCiA & SOFFIT HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1.500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: /?J u> , Date 04/12/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1303610000 in the performance of this work I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no uthority to enforce easement restrictions of which it is not a party. if you perform the work described in tIlis permit appii n witllin an easement, the City strongly urges the permit appiicant to contact tile easement holder(s) and to sec~re a cessary ap val fore sing ch activity. Signature Date f"-/"?-dW er Address 1356 DUNNING ST WI 54952 - 0000 Telephone Number 920-729-7021 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.