HomeMy WebLinkAbout0118929-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 649 W 9TH AVE
CITY OF OSHKOSH
No
118929
BUILDING PERMIT. APPLICATION AND RECORD
Owner CHASE MANHATTAN MORTGAGE CORP
Create Date
04/12/2006
Desi9ner
Contractor
AMERICAN HANDYMAN SERVICES
Cate90ry
141 - Exterior Remodeiing
Plan
Type
. Buiiding
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
UnfinishedfBasement ~Sq.Ft. Rooms
Finished/Living ~Sq.Ft. Bedrooms
Garage ~Sq.Ft. Baths
Hei9ht 0 Ft.
D Projection I
Canopies ~
Stories
Signs
~
Foundation
. Poured Concrete 0 Fioating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFR / TEAR OFF AND REPLACE EXISTING ROOFING ON HOUSE ADDITION. REPLACE WOOD DECKING. NO STRUCTURAL
of Work CHANGES. NEW FASCiA & SOFFIT
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1.500.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
/?J u>
,
Date 04/12/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1303610000
in the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no uthority to enforce easement restrictions of which it is not a party. if you perform the work
described in tIlis permit appii n witllin an easement, the City strongly urges the permit appiicant to contact tile easement
holder(s) and to sec~re a cessary ap val fore sing ch activity.
Signature
Date f"-/"?-dW
er
Address
1356 DUNNING ST
WI 54952 - 0000 Telephone Number
920-729-7021
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.