HomeMy WebLinkAbout2006-LETTER - STORMWATER
DEPARTMENT OF PUBLIC WORKS
215 Church Avenue
P.O. Box 1130
Oshkosh, Wisconsiu 54903-1130
Ph. (920) 236-5065
Fax (920) 236-5068
~
OIHKOfH
ON T<E WA'"
APR 0 7 2006
April 7, 2006
Oshkosh Investments, Inc.
2450 Witzel Avenue
Oshkosh, WI 54904
RE: Stormwater Management Practices at 2450 Witzel Avenue (formerly 100 N. Westhaven Drive)
Dear SirlMadam:
It has come to our attention that your property located at the above address was developed after the City of
Oshkosh Stormwater Management Ordinance was adopted in 1990. Please be advised that your property was
developed without providing the required onsite stormwater management practices. We realize that it would be
impractical to require you to install the required stormwater management practices at this point in time. However,
please be aware that whenever any major site construction activities are needed in the future (replacing a parking
lot for example), you will be required to bring the prOperty into compliance with the requirements of the
stormwater management ordinance in effect at the time of the original building construction in 1994.
Should you have any questions regarding this matter, please do not hesitate to contact us.
Sincerely,
~
James Rabe, P.E.
Civil Engineer I
cc:
David Patek, Director of Public Works
Ed Potempa, Civil Engineer II
Allyn Dannhoff, Director of Inspection Services
--Bt'Ían Noe, Building Systems Inspector
David Buck, Zoning Administrator / Associate Planner
File
I:\Engiueering\SWMP - (Non-residential)\2450 Witzel Ave - Choice BanklStorm
Water Management Letter.doc
Pagelofl