Loading...
HomeMy WebLinkAbout0118877-Building (windows) e OSHKOSH ON THE WATER Job Address 421 ROCK PL CITY OF OSHKOSH No 118877 BUILDING PERMIT -APPLICATION AND RECORD Owner HALDWILLIAMS Create Date 04/10/2006 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building Q Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms --.0 Stories Baths 0 Zoning Size Unfinished/Basement --.0 Sq. Ft. --.0 Sq. Ft. 0 Projection I Finished/Living Canopies 0 Garage --.0 Sq. Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature SFR/ install 7 replacement windows in existing openings - No Structural Work. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,195.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 04/10/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcel Id # 1003790000 In the peliormance of this work I agree to peliorm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you peliorm the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 235 MORRIS ST AgenUOwner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.