HomeMy WebLinkAbout0118870-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 16691671 MARICOPA DR
CITY OF OSHKOSH
No
118870
PLUMBING PERMIT - APPLICATION AND RECORD
Owner GERALD W/KATHLE KRUEGER
Create Date 04/10/2006
Contractor MERTEN PLUMBING
Category 411 - Residential-Water Heaters
Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
ofWork
Valuation
Issued By
0
0
0
0
0
0
1
0
0
0
Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink ~ Coffee Maker 0
Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ex! Grease Trap 0
Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn ~ RPZ Valve 0
Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp ~
[= ~="~~e ^"~ ~'coe' "æ", ~~
Type
#
0
0
0
0
0
0
0
0
0
0
Conn. Type
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1318090000
$670.00
Plan Approval -~
$20.00 0 Permit Voided I
Permit Fees
Date 04/10/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easemant restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1076 COZY LN
AgenUOWner
OSHKOSH
WI 54901 - 0000
Telephone Number 231-6795
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.