HomeMy WebLinkAbout0118891-Building
e
OSHKOSH
ON THE WATER
Job Address 402 KNAPP ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118891
Owner JOSEPH M LENTZ
Create Date
04/10/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
~
Zoning
Size
Unfinished/Basement ~Sq.Ft. Rooms Height 0 Ft.
FinishediLiving ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFRI Remodeling the 1st floor. relocating the existing stairway and providing a larger bathroom. Microlam beams will be installed to carry
of Work !I~~n~~ ~~~~flo~r~~;i~~~ ~~ :~alii~~;e~n~~ 1~t,,~g~;'c~~; ~;~~i~~ ~~~~~:~~~ !~r~~~~I:~~~~~~d~~drooms. a bathroom, and a
HVAC Contractor
ANDRESEN SHEET METAL
SLIM'S ELECTRIC INC
Plumbing Contractor
WELLNITZ PLUMBING
Electric Contractor
Fees: valuation~
Issued BY:!\~ .
$24,600.00 Plan Approval
$75.00 Permit Fee Paid
$139.00 Park Dedication
$0.00
Date 04/10/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0604800000
In the performance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this p~rmit ap.Plica1' n within an easeme t, the City strongly urges the permit applicant to contact the ease.ment
holder(s) and to ure an~ ne ssary approva be re stariing such activity. U
Signature ì! 11. Da~ ( ,-; C>
., AgenUOwner --(=;==-
(,
OSHKOSH
WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.