HomeMy WebLinkAbout0118881-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 302 FULTON AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118881
Owner RALPH E/SUSAN M HEASTY
Create Date
Designer
04/10/2006
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement
--..2 Sq. Ft.
--..2 Sq. Ft.
Rooms
Height 0 Ft.
D Projection I
Canopies 0
Finished/Living
Bedrooms 0
Stories
Garage
--..2 Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFRI instailation of vinyi siding on the house. The owner wiil aiso be installing entry doors and the instailation of any electrical work.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $7.600.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 04/10/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1000790000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and 0 secure any necessary approvais before starting such activity. ì .. I I
Signatu Dat~
Wi 54901 - 4508
Telephone Number
Address 302FULTONAVE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.