Loading...
HomeMy WebLinkAbout0118873-Plumbing (site drain) e OSHKOSH ON THE WATER Job Address 1325 BOWEN ST Contractor D R GLAZE PLUMBING Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Site Drain Roof Drain 1 0 0 Misc. Fixtures Use/Nature ofWork CITY OF OSHKOSH No 118873 Owner MICHAEULISA DREES 0 0 0 0 0 0 0 0 0 Wail.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 0 0 0 ----.J> 0 0 0 0 PLUMBING PERMIT -APPLICATION AND RECORD Sanitary Sewer Create Date 04/10/2006 Category 410 - Residential-Interior 0 WaterSoftner 0 Local Waste 0 Clothes Wshr 0 Bidet 0 BeerTap 0 Lab Sink 0 Sterilizer 0 Dip Well 0 Drink Ftn $0.00 Agent/Owner OSHKOSH I"'~' "" ""'"' roo "^", ,~"'~,,~- Size Material Permit Fees WI 54904 - 0000 Type Plan Shamp Sink ----.J> FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs ----.J> Storm Sewer Water Service # 0 0 0 0 0 0 0 0 0 0 Conn. Type Parcelld # 1507720000 Valuation Plan Approval $20.00 0 Permit Voided I $250.00 Issued By Date 04/10/2006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party. if you perfonm the work described in this penmlt application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before stariing such activity. Signature Date Address 1865 JAMES RD Telephone Number 920-589-4014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.