HomeMy WebLinkAbout0118898-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 137 W 9TH AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118898
Owner THOMAS AISUSAN HEFT
Create Date
04/10/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Type
Zoning
Class of Const:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height ----2 Ft.
Finished/Living ----2 Sq.Ft. Bedrooms Stories
Garage ----2 Sq. Ft. Baths 0
D Projection I
Canopies 0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
.
# Dwelling Units -------.<J
Height Permit
Park Dedication
# Structures
0
Use/Nature SFR / TEAR OFF & REPLACE EXISTING ROOFING ON HOUSE AND GARAGE, REPLACE WOOD DECKING, GUTTERS AND
of Work DOWNSPOUTS, NO STRUCTURAL CHANGES
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By:
/?)4-J
$6,000.00 Plan Approval
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Date 04/10/2006
Final/O.P. 00/00/0000
D Penmit Voided I
Parcelld # 0301630000
In the performance of this work I agree to perterm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure a y necessary appro~~for in such activity. Date d.. / ò-ðcÞ
Signature ~ /"(c;- I / I
Agent/Owner
Address 137 W 9TH AVE
OSHKOSH
WI 54902 - 6053
Telephone Number :;J. 3> / - / ¿r d r
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.