Loading...
HomeMy WebLinkAbout0118898-Building (roof) e OSHKOSH ON THE WATER Job Address 137 W 9TH AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118898 Owner THOMAS AISUSAN HEFT Create Date 04/10/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan . Building 0 Sign 0 Canopy 0 Fence 0 Raze Type Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height ----2 Ft. Finished/Living ----2 Sq.Ft. Bedrooms Stories Garage ----2 Sq. Ft. Baths 0 D Projection I Canopies 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain . # Dwelling Units -------.<J Height Permit Park Dedication # Structures 0 Use/Nature SFR / TEAR OFF & REPLACE EXISTING ROOFING ON HOUSE AND GARAGE, REPLACE WOOD DECKING, GUTTERS AND of Work DOWNSPOUTS, NO STRUCTURAL CHANGES HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: /?)4-J $6,000.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Date 04/10/2006 Final/O.P. 00/00/0000 D Penmit Voided I Parcelld # 0301630000 In the performance of this work I agree to perterm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure a y necessary appro~~for in such activity. Date d.. / ò-ðcÞ Signature ~ /"(c;- I / I Agent/Owner Address 137 W 9TH AVE OSHKOSH WI 54902 - 6053 Telephone Number :;J. 3> / - / ¿r d r To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.