HomeMy WebLinkAbout2006-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 543 W 4TH AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118887
Owner KURT P THOMAS
Create Date
0411012006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
UnfinishedlBasement ----2 Sq, FI. Rooms
FinishedlLiving ----2 Sq. Ft, Bedrooms
Garage ----2 Sq. FI. Baths
Height 0 FI.
0 Projection I
Stories
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain ~
# Dwelling Units ~
Height Pennit
Park Dedication
# Structures
0
UselNature SFR I INSTALL SIDING ON HOUSE, REPLACING SLATE WITH VINYL, ELECTRIC NOT APPliCABLE ALSO REPLACING 11
of Work WINDOWS, SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $5,500.00 Plan Approval
Issued By: ~M
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Date 0411012006
FinaIIO.P. 0010010000
0 Permit Voided I
Parcelld # 0600150000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in tIlis permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to lecu.~ any nece . ary approvals before starting such activity.
Signature' '" /V-- '-I -I,;! - {J
Date L(_/.!.. oJ t
Address 543 W 4TH AVE
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number
92:;ClfilJ/1
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.