HomeMy WebLinkAbout0118878-Building (door/windows)
e
OSHKOSH
ON THE WATER
Job Address 1110W 19TH AVE
CITY OF OSHKOSH
No
118878
BUILDING PERMIT -APPLICATION AND RECORD
Owner MARK EfTHERESA BOETTCHER
Create Date
04/10/2006
Designer
Contractor
WASCO - WISCONSIN ALUMINUM SUPPLY CC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
D Projection I
Finished/Living
Canopies
Garage
~ Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature SFRI Replacing 6' patio door. and 3 double hung windows in existing openings - No Structural Work!
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$3,845.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 04/10/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1311610000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2546 AMERICAN DR
AgenVOWner
APPLETON
WI 54914 - 0000
Telephone Number
920-730-0099
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.