Loading...
HomeMy WebLinkAbout0118878-Building (door/windows) e OSHKOSH ON THE WATER Job Address 1110W 19TH AVE CITY OF OSHKOSH No 118878 BUILDING PERMIT -APPLICATION AND RECORD Owner MARK EfTHERESA BOETTCHER Create Date 04/10/2006 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY CC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 D Projection I Finished/Living Canopies Garage ~ Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature SFRI Replacing 6' patio door. and 3 double hung windows in existing openings - No Structural Work! of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,845.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 04/10/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1311610000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2546 AMERICAN DR AgenVOWner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.