HomeMy WebLinkAbout0118906-Building (landing & steps)
G
OSHKOSH
ON THE WATER
Job Address 1024 WAUGOO AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118906
OWner KERRY J HOBART
Create Date
04/11/2006
Designer
Contractor
OWNER
Category
141-ExteriorRemodeling
Plan
Type
. Building
a Sign
a Canopy
a Fence
a Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq,Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete a Fioating Slab
a Concrete Block a Post
a Pier
a Treated Wood
a Other
Occupancy Permit Not Required
Flood Plain -
Height Permit
Park Dedication
# Dwelling Units -~
# Structures
~
Use/Nature SFRI Constructing a 4'x6' landing and steps off the front of the house. A minimum of 48" of frost protection is required in addition to code
of Work compliant handraiis, guardrails, treads and risers.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$500.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 04/11/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0204750000
In the performance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this permit application within an easement, the City strOnglY. urges the permit applicant to contact the~a ment
hoider(s) an~ to e ure any necessa approvals before starting such activity. , ",-I
Signatu\9'J "'t { u¡l::i.c;,
AgenUOwner
Address 1024 WAUGOO AVE
OSHKOSH
Wi 54901 . 5463
Telephone Number
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.