Loading...
HomeMy WebLinkAbout0118906-Building (landing & steps) G OSHKOSH ON THE WATER Job Address 1024 WAUGOO AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118906 OWner KERRY J HOBART Create Date 04/11/2006 Designer Contractor OWNER Category 141-ExteriorRemodeling Plan Type . Building a Sign a Canopy a Fence a Raze Zoning Class of Const: Size Unfinished/Basement ~Sq,Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete a Fioating Slab a Concrete Block a Post a Pier a Treated Wood a Other Occupancy Permit Not Required Flood Plain - Height Permit Park Dedication # Dwelling Units -~ # Structures ~ Use/Nature SFRI Constructing a 4'x6' landing and steps off the front of the house. A minimum of 48" of frost protection is required in addition to code of Work compliant handraiis, guardrails, treads and risers. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 04/11/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0204750000 In the performance of this work i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work described in this permit application within an easement, the City strOnglY. urges the permit applicant to contact the~a ment hoider(s) an~ to e ure any necessa approvals before starting such activity. , ",-I Signatu\9'J "'t { u¡l::i.c;, AgenUOwner Address 1024 WAUGOO AVE OSHKOSH Wi 54901 . 5463 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.