HomeMy WebLinkAbout2006-Building (city rehab)
~
OSHKOSH
ON THE WATER
Job Address 1422 RUSH AVE
CITY OF OSHKOSH
No
118911
BUILDING PERMIT - APPLICATION AND RECORD
Owner BONNIE M JUREK
Create Date
04/11/2006
Designer
Contractor
CARPENTRY BY BOB
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement --2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living --2 Sq. Ft. Bedrooms Stories
Garage --2 Sq. Ft. Baths --2
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units -----2
# Structures
-----2
Use/Nature SFRI CiTY REHAB- Repiacing the existing flat roof, 6 windows, reframe kitchen and living room wall and repair drywall, install a door and
of Work leeve out the wall to accomodate the AlC.
HVAC Contractor
Plumbing Contractor
Electric Contractor
::: :~,.~"'oo
Plan Approval
$0.00 Permit Fee Paid
$84.00 Park Dedication
$0.00
Date 04/11/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1609460000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ti n . e ,the City strongly urges the permit applicant to contact the easement
holder(s) and to see b re starting such activity.
DateÆ"i--II-ci.p
Signature
Address 5308 STATE RD 175
OSHKOSH
- ""-'- 54902 - 8504 Telephone Number
233-0870
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.