HomeMy WebLinkAbout0118913-Building (roof)
~
OSHKOSH
ON THE WATER
Job Address 909 MINNESOTA ST
CITY OF OSHKOSH
No
118913
BUILDING PERMIT - APPLICATION AND RECORD
Owner DANIEL J/GRETCH KLOEHN
Create Date
04/11/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Zoning
Size
Unfinished/Basement
---..2 Sq. Ft.
---..2 Sq. Ft.
0 Projection I
Finished/Living
Canopies
Garage
---..2 Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
--
# Dwelling Units 0
# Structures
------2
Use/Nature
ofWork
FR / TEAR OFF & REPLACE EXISTING ROOFING ON HOUSE & GARAGE, REPLACE WOOD DECKING. NO STRUCTURAL
l-'~' "'~"" W= WIT" Woe "'w 'MO' , "",.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$15.000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
Issued By:
/h tJ.r)
$0.00
Date 04/11/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0903290000
In the performance of this work I agree to perform all work pursuant to nules govemln9 the described constnuction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this omit ap llca' within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s cure ~s¥iÝ approvals before starting such activity. <
Signature Y Date t¡~ /I... 0 b
Agent/Owner
Address 909 MINNESOTA ST
OSHKOSH
WI 54902 - 6441 Telephone Number 9,;::V-;Z/f-.7Of: --
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.