Loading...
HomeMy WebLinkAbout0188905-Building (remodel) e OSHKOSH ON THE WATER Job Address 2148 GROVE ST CITY OF OSHKOSH No 118905 BUILDING PERMIT - APPLICATION AND RECORD OWner ANDRE APACANIC Create Date Designer 04/11/2006 Contractor Category 140 -Interior Remodeling UNLICENSED-UNKNOWN Plan . Building Type 0 Sign Q Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms ~ Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies ~ Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain - # Dwelling Units ----.-Q Height Permit Park Dedication # Structures ----.-Q Use/Nature f-'ondl Replace drywall. floor coverings from water damage. No structural work. Heritage Quality Construction will be doing tI1e work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $45,812.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid $202.00 Park Dedication $0.00 Date 04/11/2006 FinaI/O.P.~ 0 Permit Voided I Parcel Id # 1522680300 In tI1e perfonmance of tI1is work i agree to perfonm all work pursuant to rules goveming the described construction. While tI1e City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perfonm the work described in tI1is permit application within an easement, tI1e City strongiy urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature '¡<. ,,(~Á ¡/¿¡;t¿7¡ I .4e:t,è/&iri?16"",lrJ(J!/Jc."I)Ulf tL.?Q"m-9IDate--(" "ý-11-0.6 , Agent/OWner V Address - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.