HomeMy WebLinkAbout0188905-Building (remodel)
e
OSHKOSH
ON THE WATER
Job Address 2148 GROVE ST
CITY OF OSHKOSH
No
118905
BUILDING PERMIT - APPLICATION AND RECORD
OWner ANDRE APACANIC
Create Date
Designer
04/11/2006
Contractor
Category
140 -Interior Remodeling
UNLICENSED-UNKNOWN
Plan
. Building
Type
0 Sign
Q Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms ~ Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies ~
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain -
# Dwelling Units ----.-Q
Height Permit
Park Dedication
# Structures
----.-Q
Use/Nature f-'ondl Replace drywall. floor coverings from water damage. No structural work. Heritage Quality Construction will be doing tI1e work.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $45,812.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$202.00 Park Dedication
$0.00
Date 04/11/2006
FinaI/O.P.~
0 Permit Voided I
Parcel Id # 1522680300
In tI1e perfonmance of tI1is work i agree to perfonm all work pursuant to rules goveming the described construction.
While tI1e City of Oshkosh has no autl1ority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in tI1is permit application within an easement, tI1e City strongiy urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature '¡<. ,,(~Á ¡/¿¡;t¿7¡ I .4e:t,è/&iri?16"",lrJ(J!/Jc."I)Ulf tL.?Q"m-9IDate--(" "ý-11-0.6
, Agent/OWner V
Address
- 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.