HomeMy WebLinkAbout2006-Building (partition)
e
OSHKOSH
ON THE WATER
Job Address 639 WITZEL AVE
CITY OF OSHKOSH
No
118853
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH CITY GARAGE
Create Date
04/0612006
Contractor
CITY OF OSHKOSH
Designer
Category
262 - City of Oshkosh-Alteration
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement --.2 Sq. Ft. Rooms
Finished/Living --.2 Sq. Ft. Bedrooms
Garage --.2 Sq. Ft. Baths
Height 0 Ft.
D Projection I
Canopies --.2
Stories
Signs
--.2
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
~
Park Dedication
Use/Nature
of Work
ity Garage /Install partition with Door to separate Break Room from West hall. Install suspended ceiling.
HVAC Contractor
Plumbing Contractor
Electric Contractor
CITY OF OSHKOSH
Fees: Valuation
2,500.00 Plan Approval
$0.00 Permit Fee Paid
$0.00 Park Dedication
$0.00
Issued By:
Date 04/06/2006
Final/O.P. 00/00/0000
D PenmitVoided I
Parcelld # 0603510100
In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 1130
AgenUOWner
OSHKOSH
WI 54903 - 1130
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.