Loading...
HomeMy WebLinkAbout2006-Building (partition) e OSHKOSH ON THE WATER Job Address 639 WITZEL AVE CITY OF OSHKOSH No 118853 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH CITY GARAGE Create Date 04/0612006 Contractor CITY OF OSHKOSH Designer Category 262 - City of Oshkosh-Alteration Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement --.2 Sq. Ft. Rooms Finished/Living --.2 Sq. Ft. Bedrooms Garage --.2 Sq. Ft. Baths Height 0 Ft. D Projection I Canopies --.2 Stories Signs --.2 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures ~ Park Dedication Use/Nature of Work ity Garage /Install partition with Door to separate Break Room from West hall. Install suspended ceiling. HVAC Contractor Plumbing Contractor Electric Contractor CITY OF OSHKOSH Fees: Valuation 2,500.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Issued By: Date 04/06/2006 Final/O.P. 00/00/0000 D PenmitVoided I Parcelld # 0603510100 In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1130 AgenUOWner OSHKOSH WI 54903 - 1130 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.