HomeMy WebLinkAbout0118825-Plumbing (toilet)
e
OSHKOSH
ON THE WATER
Job Address 2015 NEBRASKA ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
118825
Contractor SAMMONS PLUMBING
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 1
Res. Sink 0
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
l~Œw'~'~œ~'" ,ocr
Use/Nature
ofWork
Owner VIRGINIA FAUST
Create Date 04/06/2006
Category 410 - Residential-Interior
Plan
0
0
0
0
0
0
0
0
0
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0
0
0
0
0
0
0
0
0
Coffee Maker 0
Int Grease Trap ~
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Sanitary Sewer
Size
Storm Sewer
Water Service
Material
Type
Valuation
$450.00
Plan Approval
$20.00 0 Permit Voided I
Issued By
$0.00
Permit Fees
#
0
0
0
0
0
Conn. Type
Parcelld #
1400710200
Date 04/06/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 231-9880
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH
WI 54901 - 2298
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.