HomeMy WebLinkAbout0118819 P
e
OSHKOSH
ON THE WATER
Job Address 1921 KNAPP ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
118819
Contractor SAMMONS PLUMBING
Owner ALICE MOTTO
Create Date 04/06/2006
Category 411 - Residential-Water Heaters
Plan
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
BarSink 0
Water Heater 1
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Use/Nature
ofWork
Shower 0 WaterSoftner
Floor Drain 0 Local Waste
Lndry Tray 0 Clothes Wshr
Disposal 0 Bidet
Dishwasher 0 Beer Tap
Sump Pump 0 Lab Sink
Classrm Sink 0 Sterilizer
Breakrm Sink 0 Dip Well
Ejector/Grind 0 Drink Ftn
0
0
0
0
0
0
0
0
0
WaitSt
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink 0
0 FlrlWst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker ~
Int Grease Trap 0
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
REPLACE GAS WATER HEATER"DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1307110400
Valuation
$600.00
$0.00
Plan Approval
Issued By
Permit Fees
$20.00 0 Permit Voided I
Date 04/06/2006
In the perfonnance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work
described In this permit application within an easement, the City strongiy urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH
Telephone Number 231-9880
WI 54901 - 2298
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.