HomeMy WebLinkAbout0118856-Building (upstairs remodel)
0
OSHKOSH
ON THE WATER
Job Address 817 HAZEL ST
CITY OF OSHKOSH
No
118856
BUILDING PERMIT - APPLICATION AND RECORD
Owner FRANKLIN CREDIT MANAGEMENT CORP
Create Date
04/06/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature SFR\ Install tub surround. add cioset in upper bedroom. eniarge upper bedroom. No bearing walls affected.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
$20.000.00 Plan Approval ~.1():QQ Permit Fee Paid
$124.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
4fí¿-
/
Date 04/06/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1105570000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to s~}1Jre any ~,\ry approv befor starting uch activity.
SIgnature' Date '-fr '" -0 b
Address 6 HARRISON ST
NEW YORK
NY 10013 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.