HomeMy WebLinkAbout0118837-HVAC (furnace)
e
OSHKOSH
ON THE WATER
Job Address 917ERIEAVE
CITY OF OSHKOSH
No
118837
HVAC PERMIT - APPLICATION AND RECORD
OWner
JACOB R B SLATTERY/JENNIFER M
Create Date 04/06/2006
Plan
Contractor
PREMIUM AIR INC
Category ~90 - Residential-Heating & Ventilating
I I Oil
-~
I
I
I I Solar
Fuel
I"'J Gas
n New
lv'I Forced Air
I I Electric
~-
U Steam
U Solid
0 Other
U AlC I U Vent
I I Con. Burner I
( ) Not Applicable
System
U Radiant
I I HotWater
I I Electric
Chimney Type ~A
( ) Chimney B
0 Existing
( ) Variable
I I Suppl.
. DirectVent
Heat Loss
K ) As Approved
[ ) As Per Plan
. Not Applicable
. Other
Value
BTU Rate
Value 45000
Use/Nature SFRI Replace furnace, Elv provided by premium Aire - No Chimney Liner bein ginstalled
of Work ~here an appliance is penmanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control
~ue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draf
$2,357.00
Plan Approval
$0.00
Permit Fee Paid
$41.00
Fees: Valuation
Issued By:
Date 04/06/2006
D Permit Voided i
Parcelld # 1306890400
In the perfonmance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address
N3225 HWY 15
HORTONVILLE
WI 54944-0
Telephone Number
920-982-3323
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspec1ion is not performed within two business days from the time the project is ready.