Loading...
HomeMy WebLinkAbout0118837-HVAC (furnace) e OSHKOSH ON THE WATER Job Address 917ERIEAVE CITY OF OSHKOSH No 118837 HVAC PERMIT - APPLICATION AND RECORD OWner JACOB R B SLATTERY/JENNIFER M Create Date 04/06/2006 Plan Contractor PREMIUM AIR INC Category ~90 - Residential-Heating & Ventilating I I Oil -~ I I I I Solar Fuel I"'J Gas n New lv'I Forced Air I I Electric ~- U Steam U Solid 0 Other U AlC I U Vent I I Con. Burner I ( ) Not Applicable System U Radiant I I HotWater I I Electric Chimney Type ~A ( ) Chimney B 0 Existing ( ) Variable I I Suppl. . DirectVent Heat Loss K ) As Approved [ ) As Per Plan . Not Applicable . Other Value BTU Rate Value 45000 Use/Nature SFRI Replace furnace, Elv provided by premium Aire - No Chimney Liner bein ginstalled of Work ~here an appliance is penmanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control ~ue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draf $2,357.00 Plan Approval $0.00 Permit Fee Paid $41.00 Fees: Valuation Issued By: Date 04/06/2006 D Permit Voided i Parcelld # 1306890400 In the perfonmance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address N3225 HWY 15 HORTONVILLE WI 54944-0 Telephone Number 920-982-3323 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspec1ion is not performed within two business days from the time the project is ready.