Loading...
HomeMy WebLinkAbout0118800-Building (windows) e OSHKOSH ON THE WATER Job Address 1001 BUCHANAN AVE CITY OF OSHKOSH No 118800 BUILDING PERMIT - APPLICATION AND RECORD Owner MARK S PHILIPP Create Date 04/06/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning -- Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature SFR. Replacce 1, existing window, and install 2 new windows on North wall. All loads must transfer properly. of Work HVAC Contractor Plumbing Contractor Electric Contractor 0.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 04/06/2006 Final/O.P. 00/00/0000 0 Permit Voided: Parcelld # 1607750000 In the performance of this work I agree to perfonm all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application wi in an em nt he City strongly urges the permit applicant to contact the easement holder(s) and to secure any rovals b re starting such activity. (1--&- 0& Signature Date ~ AgenVOwner Address 1001 BUCHANAN AVE OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.