Loading...
HomeMy WebLinkAbout0118860-Building (kitchen remodel) ,e OSÁKOSH ON THE WATER , JobP,ddress 1226 BAY SHORE DR CITY OF OSHKOSH No 118860 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL B DOBNER Create Date 04/06/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.2 Sq. Ft. ----.2 Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies Garage ----.2 Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Parik Dedication Not Required # Dwelling Units ~ # Structures ~ UselNature ßFRI Remove cracked plaster from kitchen wall. install additional stus, and drywall, wxpand bathroom into kitchen area as per plans, and of Work epair floor framing as per plans. All loads must transfer properly. HVAC Contractor Plumbing Contractor Electric Contractor 0.00 Plan Approval $0.00 Permit Fee Paid $26.00 Parik Dedication $0.00 Date 04/06/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0804030000 In the performance of this work i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform tile work described in this permit application w' hin an easement, the Ci strongly urges the permit applicant to contact the easement holder(s) and!9-" ny ces ry approvals ore sta g such activity. Signature Date ~-Oð-Otf Address 1226 BAY SHORE DR Agent/Owner OSHKOSH WI 54901 - 5410 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.