HomeMy WebLinkAbout0118860-Building (kitchen remodel)
,e
OSÁKOSH
ON THE WATER
,
JobP,ddress 1226 BAY SHORE DR
CITY OF OSHKOSH
No
118860
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL B DOBNER
Create Date
04/06/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----.2 Sq. Ft.
----.2 Sq. Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
----.2 Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Parik Dedication
Not Required
# Dwelling Units ~
# Structures
~
UselNature ßFRI Remove cracked plaster from kitchen wall. install additional stus, and drywall, wxpand bathroom into kitchen area as per plans, and
of Work epair floor framing as per plans. All loads must transfer properly.
HVAC Contractor
Plumbing Contractor
Electric Contractor
0.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Parik Dedication
$0.00
Date 04/06/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0804030000
In the performance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform tile work
described in this permit application w' hin an easement, the Ci strongly urges the permit applicant to contact the easement
holder(s) and!9-" ny ces ry approvals ore sta g such activity.
Signature
Date ~-Oð-Otf
Address
1226 BAY SHORE DR
Agent/Owner
OSHKOSH
WI 54901 - 5410
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.