HomeMy WebLinkAbout0118849-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 2540 W 20TH AVE
CITY OF OSHKOSH
No
118849
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor M P KELLY
Category 411 - Residential-Water Heaters
Create Date 04/0512006
Plan
Owner THOMAS H FEAVEL ETAL
Bathtub 0 Shower ~ WaterSoftner 0 Wail.SI. ~ Shamp Sink 0 Coffee Maker ~
Whirlpool 0 Floor Drain ~ Local Waste 0 Ice Chest ~ FlrlWst Sink 0 Int Grease Trap ~
Lavatory ~ Lndry Tray ~ Clothes Wshr 0 Exam Sink ~ Catch Basin 0 ExtGreaseTrap ~
Toilet 0 Disposal ~ Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve ~
Res. Sink 0 Dishwasher ~ BeerTap 0 Hand Sink ~ Urinal 0 Eye Wash Statn ~
BarSink 0 Sump Pump ~ Lab Sink 0 Plaster Sink --2 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 1 Classrm Sink ~ Sterilizer 0 Surgeons Sink ~ Ice Maker 0 Deduct Meters --2
Site Drain 0 Breakrm Sink --2 DipWell 0 F Prep Sink --2 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind --2 Drink Fin 0 Serv Sink --2 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
ofWork
r'" "'~ ~ .^'" ""'"
Size
Material
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 D Permit Voided I
Pareelld #
1315320000
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$720.54
Plan Approval
$0.00
Permit Fees
Issued By
~¿ð
Date 04/06/2006
In the perfonmance of this work, I agree to perfonm aU work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongiy urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
Agent/Owner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.