Loading...
HomeMy WebLinkAbout0118862-Building e OSHKOSH ON THE WATER Job Address 2700 W 9TH AVE CITY OF OSHKOSH No 118862 BUILDING PERMIT - APPLICATION AND RECORD Owner MERCY MEDICAL CENTER OSH INC Create Date 04/06/2006 Designer CR Meyer Contractor CR MEYER Category 220 - Alteration Hospitals & Institutions Plan S3-30-0406 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: 2A Size -- Unfinished/Basement --2 Sq. Ft. --2 Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage --2 Sq. Ft. Baths 0 Signs --2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature ~uite 104 -Interior remodeling alterations as per plans approved by DHFS 4/6/2006. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 00.00 Plan Approval $0.00 Permit Fee Paid $196.00 Park Dedication $0.00 Issued By: Date 04/06/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0613670000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit ap lication within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and ~n necessary appr fore starting such activity. Signature/ Date '--- Agent/Owner OSHKOSH """- 54902 - 0000 Telephone Number 920-235-3350 x219 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.